January 2004 State Feasibility Study Reports
INFORMATION BROCHURE
STUDY REPORTS
ENGINEERING REPORTS 
PUBLIC REVIEW
REVIEW AND COMMENT INFORMATION
PUBLIC WORKSHOPS
CONTACT INFORMATION 
Information Brochure (11 x 17 page format)
Information Brochure (8.5 x 17 page format)
(Sections broken out for slower modem speeds)
- Table of Contents (335 KB)
- Chapter 1 (190 KB)
- Chapter 2
- Chapter 3 (646 KB)
- Chapter 4 (547 KB)
(Sections broken out for slower modem speeds)
- Reservoir Stratification Study Text (313 KB)
- Figures (2.8 MB)
- Appendix A - Meteorological Sensitivity Plots (548 KB)
- Appendix B - 1979 (Typical Year) Simulation (656 KB)
- Appendix C - 1986 (Wet Year) Simulation (1.020 MB)
- Appendix D - 1987 (Dry Year) Simulation (687 KB)
(Sections broken out for slower modem speeds)
- Draft Environmental Evaluations Text (4.620 MB)
- Chapters 1 through 4 (1.094 MB)
- Chapter 5 (2.152 MB)
- Chapters 6 through 11 (70 KB)
- Appendices A through E (1.325 MB)
- Phase II Environmental Site Assessment (Includes Report, Figures, and Appendix A, B and C)
(995 KB) - Appendix D (1.875 MB)
- Appendix E (1.561 MB)
(Sections broken out for slower modem speeds)
- Results of Geologic Exploration Program Text (69 KB)
- Appendix A (Cone Penetrometer Logs & Data) (838 KB)
- Appendix B (Drill Hole Logs) (1.54 MB)
- Plates (Title Page) (4 KB)
- Plate 1 (250 KB)
- Plate 2 (932 KB)
- Plate 3 (1.315 MB)
- Plate 4 (981 KB)
(Sections broken out for slower modem speeds)
- Flood Analysis Report Text (661 KB)
- Appendix A (Flood Stage Data for Reservoir Islands (CALFED, 1998) (42 KB)
- Appendix B (Design Charts and Formulas Used for Wind Wave Runup Analysis) (1.18 MB)
- Appendix C (Breach Analysis; Velocity and Water Surface Elevation Distributions) (1.317 MB)
(Sections broken out for slower modem speeds)
- Seismic Analysis Report Text (1.22 MB)
- Tables 3 through 14 (629 KB)
- Figures 1 through 22 (1.422 MB)
- Attachment 1 (Earthquake Ground Motion Assessment) (516 KB)
- Appendix A (Part 1 of 3 - Seismic Sources) (161 KB)
- Appendix A (Part 2 of 3 - Figures) (3.835 MB)
- Appendix A (Part 3 of 3 - Table A-1) (52 KB)
(Sections broken out for slower modem speeds)
- Embankment Design Analysis Report Text (859 KB)
- Seepage Analysis Figures 3-1 through 3-11 (1.135 MB)
- Appendix A (Stability Analyses Results) (1.142 MB)
- Appendix B (Probability of Failure Due to Internal Erosion) (29 KB)
- Appendix C (Comparison of Piping Mitigation Alternative Concepts) (43 KB)
(Sections broken out for slower modem speeds)
- Borrow Area Geotechnical Report Text (1.262 MB)
- Appendix A (URS Corporation 2002 Geotechnical Drilling and Sampling Program) (506 KB)
- Appendix B (URS Corporation 2002 Geotechnical Laboratory Test Results) (276 KB)
- Appendix C (Bureau of Reclamation 2002 CPT Data) (877 KB)
- Appendix D (Harding Lawson Associates 1989 Boring Logs - Available Upon Request) (8 KB)
(Sections broken out for slower modem speeds)
- Integrated Facilities Engineering Design and Analyses Report (585 KB)
- Appendix A (Hydraulic Design) (780 KB)
- Appendix B (Structural Design and Analyses by URS) (851 KB)
- Appendix C (Figures C1_C8) (681 KB)
- Appendix C (Figures C9_C19) (981 KB)
- Appendix C (Figures C20_C33) (681 KB)
- Appendix D (Direct Connection to Clifton Court Forebay) (110 KB)
- Appendix D (Figures D1-D2) (815 KB)
- Appendix D (Figures D3-D5) (1.308 MB)
- Appendix E (References) (54 KB)
(Sections broken out for slower modem speeds)
- Earthwork Construction Cost Estimate Report Text (134 KB)
- Earthwork Cost Report - Figure 1 (533 KB)
- Earthwork Cost Report - Figure 2 (764 KB)
- Earthwork Cost Report - Figure 3 (694 KB)
- Earthwork Cost Report - Figure 4 (416 KB)
- Appendix A (Part 1 of 2 - Dutra Quotations) (1.701 MB)
- Appendix A (Part 2 of 2 - Syar Quotations) (1.619 MB)
- Appendix B (Basis of Construction Cost Estimates) (265 KB)
- Appendix C (Integrated Facility Earthworks Construction Cost Estimate and Overall Project Construction Schedule) (23 KB)
- Appendix C (Figures) (1.586 MB)
- Appendix C (Schedule) (4.090 MB)
Public workshops were held on February 24 in Walnut Grove and on February 25 in Sacramento. Workshop handouts and presentation materials are available below.
-
Workshop Agendas
-
Power Point Presentations
-
Individual Public Comment Letters
- Bay Area Water Supply & Conservation Agency
- California Business Properties Association
- California Business Roundtable
- California Chamber of Commerce
- California Council for Environmental and Economic Balance
- California Farm Bureau Federation
- California Legislature
- Ducks Unlimited
- East Bay Municipal Utility District
- Natural Heritage Institute
- Northern California Water Association
- Pacific Gas and Electric Company
- Peter Margiotta
- Placer County Water Agency & Recreational Boaters of California
- Port of Stockton
- San Joaquin River Group Authority
- San Luis & Delta-Mendota Water Authority, Westlands Water District
- Santa Clara Valley Water District
- Silicon Valley Manufacturing Group
- State Water Contractors
The California Department of Water Resources and the Bay-Delta Program have completed the In-Delta Storage Program State Feasibility Study that addresses the technical feasibility of the proposed In-Delta Storage Project. All Draft State feasibility study reports were released on February 4, 2004 and comments were due on March 20, 2004. We will continue to accept comments on the draft reports and welcome input regarding the In-Delta Storage Program.
Please submit comments to:
U.S. mail to:
Jeremy Arrich
DWR, DPLA
PO Box 942836
Sacramento, CA, 94236-0001
Other mail or delivery to:
Jeremy Arrich
DWR, DPLA
901 P Street, Room 213A
Sacramento, CA 95814
Email to:



